From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
LARRY NEIDHARDT JR. Telephone:
602-743-8986
15727 Cutten Road Email: LarryNeidhardt@aol.com
Houston Texas,
77070
Project
Controls Specialist and Cost Controller: Broad responsibilities to include
project controls, scheduling, proposal coordination, cost controls and
revenue analysis in an international business environment. · Successfully planned offshore energy projects from basis
of estimates and fast tracked resources in a safe manner to help contribute
to high gross profit margins on several projects. · Streamlined international operations by developing
resource critical paths and consolidating resources. · Successfully managed and developed budgets for numerous
projects. · Over ten years of international experience working in
different cultures. Europe, Asia and Middleast. · Project experience in several sectors to include Aviation,
IT, Insurance, Oil and Gas and Energy Utilities. Dedicated
degreed Project Controls Specialist with over ten years of experience.
Special emphasis on reducing costs and increasing revenue by looking for
value in a detailed resource leveled schedule. Pro
Active manager who has lead and worked successfully with many people in
different cultures. Qualifications: BSBA in
Finance Northern Arizona University-Flagstaff, Arizona USA 2002 MS
Project 2007 MCTS 70-632 Certified, April 2012 MS
Project 2010 MCTS 70-178 Certified, August 2012 MS
Project 2013 MCTS 74-343 Certified February 2014 Primavera
P6 Advanced Course 106-R. Resource Leveling in P6: Houston Texas Primavera
Experience: (3.5) years MS
Project: (10) years Workfront
Attask: (1) year Professional
Experience: Loadmaster
Engineering/Universal Rigs – Land and Offshore Drilling Rig Manufacturer in
Houston Texas. March 2015 to Present. Duties include being the lead project
planner for a 3000HP Offshore Modular Drilling Rig. Successfully took over
the planning and control of the rig project and built a full project schedule
in Workfront Attask that included all of the engineering, construction and
offshore commissioning activities of the rig. These actions lead to the rig
being delivered on time. Also creates MS Project schedules for customer
reporting to their systems. Maintains a critical path of the project at all
times. Coordinates engineering drawings between engineering, procurement and
manufacturing. Builds proposal schedules. Manages engineering change requests
and requests for information. Builds schedules off of General Assembly
drawings, to included procurement schedules. Dril Quip
– Offshore Subsea Drilling Manufacturing Company in Houston Texas. January
2013 to March 2015. Duties included planning subsea wellhead systems and
supporting equipment in Primavera P6 Rel 8.1. Maintained and updated over ten
thousand lines of activities. Maintained a constant critical path across all
sales orders. Supported Dril Quip engineering planning efforts with MS
Project 2010. Created proposal schedules for sales department. Creates
specialized Primavera layouts and S-Curves for management and customers.
Coordinated and Communicated schedule information between engineering, sales,
manufacturing and finance. Trained coordinators and schedulers in both
Primavera and MS Project 2010. Aerotek-
IT Services Company in Olympia Washington (Contract position) October
2012 to December 2012. Project Scheduler: Duties included planning requirements,
development, testing and call center operations for a health insurance
project for the State of Washington. Successfully developed a schedule with a
critical path. Hewlett
Packard- IT Services Company in Olympia Washington September
2011 to October 2012 Project
Analyst: Duties includes maintaining a fully resource loaded schedule in MS
Project with over 12 thousand tasks. Estimating project EAC’s and providing
cost estimation and coordination of project change request for IT project.
Manages project data files in Microsoft Visual Studio. Provides project
analysis to include variance analysis and headcount data. Advises project
team on Earned Value Analysis and Critical Path Analysis. Arizona
Public Service (APS) - an energy utility company based in Phoenix, Arizona
USA Feb 2011 to August 2011 Program
Scheduler: Duties included maintaining the project activity network in
Primavera P6 and creating reports for management on an IT capital project
portfolio. Adding project activity codes, resource loading and identifying
project tasks that may be of risk to the portfolio. Created a Primavera
activity network template to establish project methodology. Created reports
out of Primavera to include headcount and project slippage reports.
Coordinated cost reports out of the monthly project reviews and provided
feedback to management on review discrepancies. Created reports to
management on ad hoc basis when required. Notified management about project
overruns. Core Competencies People
Management
Workload
and Stress Management
Technical
Skills
Cultural
Capabilities
I am
single and can relocate to any worldwide location. I can
provide references upon request. Organizations:
Association for Advancement of Cost Engineers. Retired U.S Air Force/Air
National Guard 1987-2007, F-16 Engine and Airframe Technician |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
|